Bibliography

Virginia

I-64 Major Investment Study (Evaluation of Hampton Roads High Speed Rail). March 1999, prepared by Parsons Brinkerhoff for the Virginia Department of Transportation.

Bristol Rail Passenger Study Phase 2 Final Report. July 1998, prepared by Frederick R. Harris for the Virginia Department of Rail and Public Transportation.

The Northeast Corridor Transportation Plan-Washington D.C. to New York City. Phase II. Washington to Richmond Supplement. (Revised Draft Report.) September 1998, prepared by the Federal Railroad Administration and the National Railroad Passenger Corporation.

Washington D.C. to Richmond Rail Corridor Study. April 1996, prepared by URS for the Virginia Department of Rail and Public Transportation.

North Carolina

(Note: "Piedmont High Speed Corridor" was the original North Carolina name for the proposed Washington-Raleigh-Charlotte high speed corridor)

Civil Engineering Evaluation of the Piedmont High Speed Corridor, Raleigh - Charlotte, North Carolina. September 1996, prepared by JBM Engineers & Planners.

Piedmont High Speed Corridor (Engineering) Evaluation: Richmond to Raleigh, Final Report. February 29, 1997, prepared by TranSystems Corporation.

Operations Analysis of Proposed High Speed Rail Passenger Service Between Raleigh and Charlotte, North Carolina. March 1997, prepared by Corporate Strategies, Inc.

Piedmont High Speed Corridor Line Capacity Analysis Between Richmond and Savannah via CSX A and S lines. April 24, 1997, prepared by Wilbur-Smith Associates.

Railroad Station Study, Piedmont High Speed Corridor. February 27, 1997, prepared by Marsolan Associates.

Piedmont High Speed Corridor (Raleigh, NC to Charlotte, NC) Environmental Screening Report. January 28, 1997, prepared by Carter & Burgess, Inc.

State of North Carolina Piedmont High Speed Corridor Ridership and Revenue Potential: Phase I - Raleigh to Charlotte, Phase II - Charlotte to Washington, DC. November 1996, prepared by KPMG Peat Marwick, LLP.

North Carolina High Speed Rail Economic Impact and Transportation Benefit Analyses (Raleigh-Charlotte). November 1996, prepared by KPMG Peat Marwick, LLP.

North Carolina High Speed Rail Economic Impact Analysis (Washington-Charlotte). November 1998, prepared by KPMG Peat Marwick, LLP.

"Piedmont High Speed Corridor Operating Scenarios (Raleigh - Charlotte)." September 18, 1996. Report prepared by William Gallagher (Consultant) and Amtrak.

"Operating Cost Analysis of Piedmont Corridor Rail Improvements (Washington-Charlotte)." May 19, 1998. Prepared by Amtrak.

Benefit-Cost and Risk Assessment: High Speed Rail Investment Alternatives in the Piedmont Corridor (Raleigh-Charlotte). February 19, 1997, prepared by Hickling Lewis Brod, Inc.

Cost Benefit Analysis of the Piedmont High Speed Corridor (Washington-Charlotte). December 9, 1998, prepared by Science Application International Corporation and Corporate Strategies, Inc.

Piedmont High Speed Corridor Draft Technical Memo on Funding and Financing Sources. October 25, 1996, prepared by Price Waterhouse, LLC.

South Carolina

South Carolina Statewide Passenger Rail Transit Plan and Program. December 1997, prepared by Wilbur-Smith Associates.

Statewide Transportation Plan. December 1995, prepared by Wilbur-Smith Associates.

South Carolina Rail Plan 1995 Update. Prepared by the South Carolina Department of Commerce, Division of Public Railways.

Georgia

Intercity Rail Plan, Final Report. March 1997, prepared by LS Transit Systems Inc.

Intercity Rail Plan, Technical Reports Volume III: Capital Cost Report, Operations and Maintenance Cost Model Methodology,Benefits and Costs, and Overview of Financing. March 1997, prepared by LS Transit Systems Inc.

Intercity Rail Plan, Technical Reports Volume II: Ridership Model Validation Report, GIS Development and Model Users Guide. October 1996, prepared by LS Transit Systems Inc.

Intercity Rail Plan, Technical Report Volume I: Overview of Potential Intercity Rail Corridor, Potential Station Locations and Overview of Technologies. May 1996, prepared by LS Transit Systems Inc.

Proposed Intermodal Program for Rail Passenger Service in Georgia: Program Description and Action Plan. January 1999, prepared by the Georgia Department of Transportation.

 Southeast States

Southeast High Speed Rail Study: Market and Demand Analysis. December 1996, prepared by KPMG Peat Marwick, LLP.

 USDOT

High Speed Ground Transportation for America. September 1997, prepared by the Federal Railroad Administration.

 

Chapter:I 1 I 2 I 3 I 4 I 5 I 6 I 7 I 8 I 9 I 10 I 11 I 12


SEHSR Logo